ActiveReports 8 Server End User Guide
Report History

You can view the most recent results of your scheduled tasks on the History tab.

The name of each entry in the History list corresponds to a scheduled task that ran the report. The date and time of an entry indicates when a report was run.

When the time period specified in the Result expires after setting expires, the open link is disabled and the report can no longer be opened.

To view a report in History

  1. Under the History tab, click an entry in the list.

    Selecting an entry opens the Details section that shows the report rendering format and the status of the scheduled task execution.

  2. Above the Details section, click Open to view the rendered report in a separate window.
See Also

 

 


Copyright © 2015 GrapeCity, inc. All rights reserved

Support Forum