ActiveReports 8
3D Pie Chart
Show AllShow All
Hide AllHide All

Pie charts are useful in showing how the percentage of each data item contributes to the total. This walkthrough illustrates how to create a three dimensional pie chart.

The walkthrough is split up into the following activities:

When you complete this walkthrough you get a layout that looks similar to the following at design time and at runtime.

To add an ActiveReport to the Visual Studio project

To add the Chart control to the report

To add a series and data points to the Chart

To configure the appearance of the Chart

To view the report

See Also

Concepts

Support Forum